The inspection guidelines for the survey of pipework system supports on UK nuclear power plants requires the comprehensive inspection of all the steam and feed system pipework supports at statutory outages. This is carried out in three separate stages; on load prior to (pre-outage hot), off load during (outage cold) and following return to service (post-outage hot).